Full walkthrough, no signup, 4 minutes

Watch a plan sheet turn into a quote and submittal set in one scroll.

Same job a human estimator ships in 2 to 3 days. ARC reads the plan, identifies every precast structure, prices it from your catalog, and drafts the submittal set. You review, adjust, and send.

21
structures priced in the demo run
under 4 min
from plan drop to submittal
1
clicks required from you
1Step 1The plan arrives

You drop the plan into ARC. That is the only manual step.

No preprocessing, no XLSX prep, no scoping the sheets. Full civil PDF from the contractor, as-is. ARC handles the multi-sheet index, the schedule tables, and the profile views.

  • Handles 200+ MB drawing sets without slicing
  • Reads schedule + profile + plan view cross-references
  • Locks the sheet to your workspace, not a public bucket
New job / drop a plan
Drop plan PDF here
or click to browse
SR-42-Culvert-Rev-C.pdf147 MB / 12 sheets
2Step 2Every structure is identified

Every structure. Boxed, labeled, and pulled from the schedule.

Drag the divider. Left is the raw sheet the contractor sent. Right is the same sheet after ARC has resolved every precast structure against the schedule table.

21
Structures identified on this sheet
12
Schedule rows cross-referenced
0
Missed by the model on this run
STM MH-1STM MH-2STM MH-3STM MH-4STM MH-5CB-1CB-2CB-3CB-4CB-5CB-6CB-7CB-8IN-1IN-2IN-3IN-4IN-5BX-1BX-2SN MH-1N0 20 40 FTSR-42 CULVERT REPLACEMENTSTORM DRAINAGE PLANSHEET C-105 / REV C / 07 07 2026SCALE 1" = 20'-0"
N0 20 40 FTSR-42 CULVERT REPLACEMENTSTORM DRAINAGE PLANSHEET C-105 / REV C / 07 07 2026SCALE 1" = 20'-0"
Raw plan sheet
ARC parsed
3Step 3The takeoff runs

The takeoff runs live.

Every structure gets a row with rim, invert, depth, and pipe. Values come from the plan and the schedule, not from a template. This is a replay of a real production run: 21 structures, live values, no cherry picking.

The catch flag ARC raises in this replay is a real unlabeled callout on the input plan. Your estimator gets a nudge before the quote goes out, not a support ticket after the job.

Watch it work. Replay of a real production run: North Market Street sewer separation, 21 precast structures.

STRUCTURES 0/21
STRUCTURETYPERIMINVERTDEPTHPIPE
+ 14 more structures read the same way, every value from the printed plan.

One question raised, not guessed: unnumbered callout on sheet 8. Flagged for your estimator to decide, not counted.

Takeoff total21 structures

21 of 21. Every run.

Anything uncertain becomes a question, not a mistake.

Send us your plans. Takeoffs back tomorrow.Two or three plans you already quoted is all it takes.
4Step 4The quote assembles

Pricing comes out of your catalog, not thin air.

Line items reference your plant's SKUs. Override any row inline. When you press Send the quote goes out on your letterhead, with your terms.

  • Grouped by structure family for readability
  • Delivery + set-on-grade included by default
  • Terms, taxes, and lead time pulled per client
Quote
Q-2026-0714
Prepared for
Ridgeline Site Contractors
SR-42 Culvert Replacement
CodeDescriptionQtyUnitPriceExtended
STM MH-4-0Storm manhole, 4 ft dia, precast, 8 ft to 10 ft depth5EA$3,250$16,250
STM MH-4-DStorm manhole, 4 ft dia, deep, 10 ft to 14 ft depth3EA$4,180$12,540
CB-DBLDouble catch basin with cast iron frame + grate8EA$2,140$17,120
IN-STDStandard curb inlet, precast5EA$1,560$7,800
BX-6X4Precast box culvert, 6 ft x 4 ft, 8 ft segments2EA$8,420$16,840
SN MH-4Sanitary manhole, 4 ft dia, precast, 10 ft depth1EA$3,480$3,480
FRAME-CCast iron frame and cover, H-20 rated9EA$385$3,465
DELIVERYDelivery and set on grade, site route included1LOT$6,800$6,800
Subtotal$84,295
Tax (6.5%)$5,479
Total$89,774
5Step 5Shop drawings and submittal set

Shop drawings and submittal set, ready to email.

Every structure gets its own shop drawing with elevations, dimensions, opening callouts, and rebar schedule. Cover page, product data, mill certs, and cutsheets are stapled into one PDF at the end.

The submittal set for the sample job above runs 34 pages. It takes ARC about 90 seconds after the quote is locked.

Storm MH-3 shop drawing
4 ft dia, 10.7 ft depth, 3 openings
DWG-018
PLAN24" RCP IN24" RCP OUT4'-0" IDELEVATION10'-9"RIM 930.87 / INV 922.88ASTM C-478
CB-4 shop drawing
Double catch basin, H-20 frame
DWG-042
PLAN12" RCP OUT7'-2"SECTION A-A4'-6"H-20 FRAME + GRATE, CAST IRONASTM A-536 GR 80-55-06
Submittal set index / 34 pages
01
Cover + index
02
Summary of structures
03-24
Shop drawings (21 structures)
25-28
Product data + cutsheets
29-31
Mill certs
32-33
Precast plant NPCA cert
34
Signature block
Human estimator
2 to 3 days
  • Print the sheets or squint at a monitor
  • Highlight structures by hand, count twice
  • Cross reference the schedule table
  • Type the takeoff into the estimating spreadsheet
  • Draft the quote and price it from the catalog
  • Build the submittal set page by page
ARC
under 4 min
  • Drop the plan PDF into ARC
  • Structure detection runs while you refill coffee
  • Takeoff table streams live with real values
  • Quote assembles from your catalog automatically
  • Shop drawings render per structure
  • You review, edit, and press Send

See it run on your own plans.

Pick a job on your desk right now. We schedule 20 minutes, you send the plan, and we walk through the takeoff, quote, and submittal set live. If it does not save you a day, we do not deserve the call.

14 day Workflow Sprint, $5K, money back on day 14 if we miss the success metric.